Problem producing PDF of Schedule per Job.

About Support Rota Problem producing PDF of Schedule per Job.

  • This topic is empty.
Viewing 10 posts - 1 through 10 (of 10 total)
  • Author
    Posts
  • #2996
    Avatar for Michael PriceMichael Price
    Participant

    It appears from the documentation and also the tutorials on this web site that I should be able to produce a PDF showing the Rota for each job.
    The problem is that the instructions in either the documentation or the tutorial do not match what I am seeing in my version of Church Admin. (2.5920)
    When I select the Schedule Dashboard Navigation Pane item I do not see any option to export PDF or Communicate the Schedule.
    When I select “View Schedule” from the Dashboard the focus is simple switched back to the “Schedule” dashboard item. I am unable to view the Scedule except by logging in as each individual user to get only their list of jobs and dates.
    I am running the plugin on our subscription of WordPress.com.

    #4503
    Avatar for Andy MoyleAndy Moyle
    Keymaster

    Hi Michael, Welcome to the support forum.
    Looks like I forgot to add PDF and CSV downloads of the Schedule, when I sorted out the menu layout. I’ve added them back in v 2.5930.

    #4509
    Avatar for Michael PriceMichael Price
    Participant

    Thanks Andy. I can see those now as I am using auto updates.
    CSV is working as expected however PDF is not. I have a scheduled job “Alter Linen” associated with the 5:30pm Sunday service on March 1.
    This as well as the rosterred person is showing up in the CSV output but the Alter Linen Job as well as the rostered person are absent from the PDF output.

    #4510
    Avatar for Michael PriceMichael Price
    Participant

    After further investigation I believe the problem may be assoicated with the “Select Month” field. It appears to ignore this field and the output contains only the services in the current month.

    #4513
    Avatar for Andy MoyleAndy Moyle
    Keymaster

    That’s intended behaviour! If you want a different month, select one, else it defaults to the current month ;-)

    #4518
    Avatar for Michael PriceMichael Price
    Participant

    Sorry, perhaps I wasn’t clear. I select Mar 2020 but the resultant PDF shows “February xx 2020” on the date headings.
    It does this no matter which month I select.

    #4520
    Avatar for Rich CoxRich Cox
    Participant

    Hi Andy, Michael,

    Just checked this on my site and it’s the same. Selecting March still displays February in the heading of PDF’s.

    Many thanks,
    Rich.

    #4528
    Avatar for Andy MoyleAndy Moyle
    Keymaster

    On the rota/schedule page – I’ve just updated the PDF link so it grabs the date from the drop down and serves the right month. v2.5950

    #4535
    Avatar for Rich CoxRich Cox
    Participant

    Hi Andy,

    Have updated to v2.5960 and it is still pulling PDF date of current month rather than selected month from the drop down. (i.e. March still shows Feb).

    Thanks,
    RIch.

    #4536
    Avatar for Andy MoyleAndy Moyle
    Keymaster

    For me it is only working one first drop down change. Will fix that

Viewing 10 posts - 1 through 10 (of 10 total)
  • You must be logged in to reply to this topic.